Severance Middle School
GC: Roche Constructors
Architect: RB&B Architects
1801 Avery Plaza Street, Windsor, CO 80550
This new middle school in Weld County consists of both load-bearing and non-load-bearing CMU construction, most with a ground-faced finish. The exterior of the building is finished in pre-cast and brick veneer. Typical of many school construction projects, this one required top craftsmanship while sticking to a tight schedule.